====Architects Preliminary Requirements==== [[https://docs.google.com/document/d/1KcHF_iHykZ8TRsPtQbNJ92DIXfxBM0hx--LL4Hru4u0/edit?usp=sharing|Link to Google Doc]] ====Requirements==== * Power: 440v 3-phase ("heavy power") * Size: 5,000 sq.ft. - 12,000 sq.ft. * Office/Finished::Open Area Ratio 50/50, or finishable/divisble by us * Restrooms: Men's & Women's (at least two restrooms that we can assign) * Parking: 6-12 paved spaces w/ overflow (on street, adjacent lot after hours, etc) * Zoning: Light Industrial / Acceptable for Machining * Internet access available (provider has a presence, or can reasonably establish one) * Ceiling Height: 12'+ (open areas) * Access: 1 overhead door * Other considerations * Concrete floor in open space * Acceptable for welding * Heated * Location: Close freeway access / within or near Lansing freeway loop (69/96/127) * Neighborhood: Grandma safe //note: while the requirements are desired, we respect that there may not be a perfect fit.// [[Principal permitted uses policy]] ====Secondary Considerations==== * Fire suppression (for insurance / occupancy) * Certificate of occupancy (no major impediments to occupancy) * Accessibility (or reasonably made accessible) * Non-multistory OR elevator equipped (for accessibility, large equipment movement, etc) ====== Locations ====== [[Individual space data]] (Currently restricted to board members only)